logo
logo
  • Home
  • About Tripura
    • Tripura
    • Governon
    • Chief Minister
    • Council of Ministers
  • Tripura
  • National
  • International
  • Lifestyle
  • Spotlight
  • Sports
  • Jobs/Tender
  • Photo Album

Japan to gift Shinkansen trains for India’s bullet train trials, ahead of new loan pact

By IBNS
Apr 18, 2025..

New Delhi/ Tokyo: In a significant boost to India’s first bullet train project, Japan will donate two Shinkansen train sets to assist with testing and inspection of the Mumbai-Ahmedabad High-Speed Rail corridor, Japan Times has reported.


One E5 and one E3 series train will arrive in early 2026, each retrofitted with inspection equipment to assess operational challenges unique to Indian conditions, such as high temperatures and dust.

The data gathered from these test runs will help fine-tune the corridor’s systems and pave the way for the introduction of next-generation E10 trains, which are expected to be produced in India starting in the early 2030s.

Until then, modified semi-high-speed trains made domestically are expected to run on the corridor.

The Mumbai-Ahmedabad route marks a milestone in India’s infrastructure development, supported by Japan’s renowned Shinkansen technology.

The project is being funded predominantly through low-interest yen loans from the Japanese government, which cover about 80% of total costs.

With rising expenses, both governments are working to finalise a fresh loan framework to support the introduction of E10 trains, likely to be discussed during Prime Minister Narendra Modi’s upcoming visit to Japan for a bilateral summit.

The donated Shinkansen trains represent Japan’s engineering excellence.

The E5 is known for its speed and streamlined design, while the E3 series balances efficiency and passenger comfort.

Their deployment in India will generate vital insights into the track conditions and overall performance of the corridor.

Construction of the high-speed rail corridor, led by the National High-Speed Rail Corporation Limited (NHSRCL), has been progressing steadily since November 2021. So far, bridges have been built across six rivers in Gujarat as part of the 24 total river crossings along the route.

Highlighting the project's transformative potential, Union Railway Minister Ashwini Vaishnaw had earlier noted, “The bullet train project has to be seen from the perspective of integrating economies… You can have breakfast in Surat, complete your work in Mumbai, and return with your family by night.”

Leave a Reply
Post comment
Related News
Pakistani drones sighted at 26 Indian locations, leave 3 injured in Punjab's Ferozepur
May 9, 2025 ..
India activates 14 infantry battalions of Territorial Army amid escalation with Pakistan
May 9, 2025 ..
Taslima Nasreen free to travel across India, says MEA after BJP MP seeks her return to Kolkata
May 9, 2025 ..
Fresh Pakistani drones target Jammu, Samba and Pathankot; explosion heard in Pokhran
May 9, 2025 ..
PM Modi meets all three service chiefs amid escalated tensions with Pakistan
May 9, 2025 ..
Newsletter

Subscribe For Northeast Herald News And Receive Daily Updates

logo

Northeast Herald starts its journey from Tripura state capital city Agartala to cover the entire Northeast region of India for the latest news, news photos, and the latest photos to promote the great cultural, historical and traditional identity of the region.

  • Twitter Icon
  • About Tripura
  • About Northeast
  • National News
  • Tripura News
  • International
  • Entertainment
  • Spot Light
  • Article Us
  • Health
  • Lifestyle
  • Top News
  • Sports
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Disclaimer
  • Cookies Policy
  • Code of Ethic
  • Site Map
  • Rss Feeds

Copyright © Northeast Herald. All Rights Reserved